I-80 Integrated Corridor Management Plugin Support, Contra Costa County, CA

In this project, CLR Analytics developed the Lane Management plugin for the Paramics software based on the design from DKS.

We also provided supports to the DKS team on

  • how to use various plugins developed by CLR Analytics
  • some on-call simulation modeling questions
  • a ramp metering scenario testing run.

 

Prime Contractor: DKS Associates and Kimley-Horn and Associates

Sponsor: Alameda County Congestion Management Agency (ACCMA)

Project Time Period: Mar 2009-Jun 2009